1-3 OCTOBER 2013, MOSCOW, RADISSON SLAVYANSKAYA HOTEL
Vladimir Polyakov
Principal Project Engineer, Irgiredmet
Vladimir Polyakov graduated from the Irkutsk Technical University in 2005. He has a bachelor's and master's degrees in Mining, an engineering degree in Underground mining. From 2005 he has been working in different mining design companies. He is currently employed by Irgiredmet as a Senior Project Engineer and is writing a Ph.D thesis – "Justification of development parameters of system with ore shrinkage in difficult mining and geological conditions".
TECHNICAL SESSION 4
The criteria for determining the boundaries of open pit and underground mines in the development of gold deposits.
В докладе рассматриваются актуальные проблемы, связанные с определением рациональных параметров комбинированной и, в том числе, совместной (при совмещении открытых и подземных работ в пределах одного месторождения во времени) разработки месторождений. Освещается опыт ОАО «Иргиредмет», как научной и проектной организации, в решении вопросов комбинированной разработки. Представлены примеры из практики выполнения ТЭО разведочных кондиций и подсчета запасов, а также проектирования параметров комбинированной отработки месторождений.